Project Overview

Gurugram

Bandhwari Landfill Remediation & Integrated Waste Processing

The Bandhwari landfill stood as a colossal environmental challenge for the National Capital Region, casting a long shadow over the fragile Aravalli ecosystem. Our mission was not merely to manage waste, but to orchestrate a massive ecological rescue. By engineering large-scale bio-mining alongside advanced fresh-waste processing, we launched a dual-front campaign to dismantle decades of accumulated legacy waste while ensuring the city's daily refuse never adds to the burden.

Bandhwari Bio-Mining

To combat the towering garbage mountains shadowing the Aravalli belt, we mobilized massive-scale bio-mining operations. Through rigorous mechanical screening, we are methodically breaking down and processing hundreds of thousands of metric tonnes of historical waste.

1200+
Daily MT Processing Capability

Every single day, our infrastructure efficiently processes over 1,200 metric tonnes of combined fresh and legacy municipal solid waste, a relentless operational pace critical to halting new accumulations.

High-Grade RDF Extraction

We established a closed-loop system for combustible waste fractions, systematically converting them into high-calorific Refuse-Derived Fuel (RDF). This vital resource now powers Waste-to-Energy (WtE) plants and cement kilns across Northern India.

Project Partner
Kochi Municipal Corporation Logo
Municipal Corporation
of Gurugram
Scroll Down
Environmental Restoration

Before vs After Imaging

Experience the visual proof of our intervention. Simply glide your cursor across the image to see how we transformed environmental liabilities into restored coastal landscapes.

Before Intervention
After Restoration
Gurugram Unit Performance

Operational Insights

Core Approach

Project Overview

The towering Bandhwari site was long considered one of the NCR’s most critical environmental vulnerabilities. Confronted with millions of tonnes of accumulated refuse and Gurugram's surging daily waste generation, we engineered a comprehensive counter-offensive. By deploying heavy-duty trommels and automated sorting lines, we instituted a dual-pronged strategy: actively intercepting the daily influx of fresh refuse while systematically dismantling the legacy mountain to reclaim prime land and protect vital groundwater reserves.

Capacity

4,000

Capacity (Tons Per Day)

Engineered for peak performance, our facility maintains the infrastructure required to prevent urban congestion by processing massive daily throughput without latency.

Fuel

2.5+ Lakh

RDF Fuel Dispatched (MT)

By diverting non-recyclables into high-calorific energy sources, we power industrial progress while decoupling urban growth from landfill dependency.

Processed

15+ Lakh

Total Waste Processed (MT)

A monumental milestone that reflects our systematic decontamination efforts, removing massive environmental burdens from the regional ecosystem.

Fuel

50,000+ K

Organic Compost (MT)

Closing the ecological loop through precise bio-processing. We return valuable organic matter to the soil, bolstering regional agricultural health and food security.

Fuel

22+ Acres

Land Reclaimed

Beyond processing, we focus on remediation. By reclaiming vast tracts of land, we are restoring natural topography and creating space for future civic value.

Our Proven Work Process

A meticulous journey from planning to execution, designed specifically for the unique demands of a coastal urban center.

01
Assessment
Phase 1

Work order date / erection commencement

The journey begins with deep scientific analysis. We mapped out the seasonal moisture variations of gurugram to build a system that stands strong even against the monsoon.

02
Segregation
Phase 2

Civil completion

Building the foundations of resilience. Our civil infrastructure was completed with specialized waterproofing and containment systems to isolate processing from the ground.

03
Treatment
Phase 3

Machinery erection

Engineering comes to life. We installed precision trommels and separators designed to tackle the unique, heavy composition of coastal municipal waste.

04
Monitoring
Phase 4

Statutory compliance

Transparency and safety above all. We conducted rigorous testing and received all legal validations, confirming that our facility meets and exceeds environmental safety laws.

05
Treatment
Phase 5

Commercial operation date

The vision realized. Our full-scale commercial operations are now actively cleaning the city, transforming waste into energy and hope for a greener gurugram.

The Results

Impact Delivered

Protected Backwaters

Protected Backwaters

We have successfully decoupled urban growth from water pollution, ensuring gurugram's iconic waterways remain untainted for generations.

RDF Generation

High-Yield RDF Generation

By extracting energy from the most challenging waste streams, we provide local industry with a cleaner, high-calorie fuel alternative.

Resilient Urban Model

Resilient Coastal Model

Kochi now serves as a global blueprint for coastal waste management, proving that ecology and economy can thrive together.